Solid beverage processing is an OEM service provided by processing plants based on customer requirements for products. The OEM factory calculates the processing price according to the specific project provided, the processing technology of the customer's product, and the basic cost of the factory's production, and charges the processing fee. Solid beverage OEM manufacturers usually complete the fee settlement through two charges, once after signing the contract, and once after the entrusted production of customized powder, granule or substitute tea products is completed.

033103

How about the price and charging method of solid beverage processing?


Solid beverage OEM price


The processing price is affected by many factors, and it is also one of the main reference items for customers who have a large number of orders and urgently need processing factories to choose OEM manufacturers. However, the determination of the processing price can only be concluded after a variety of factors are clarified, so the customer and the factory need to determine the specific matters of each link:


1. Various raw materials required for production: whether the raw materials are purchased by the customer or purchased by the factory; whether the Chinese medicinal materials of the same origin as medicine and food should be crushed and sterilized by the customer by contacting the crushing manufacturer, or by the solid beverage OEM factory.


2. Design and processing of packaging materials: Whether the customer completes the design and processing of packaging materials by himself or not, directly provides the factory's ready-made packaging materials; the factory provides the design scheme of insourcing and outsourcing, which is determined by the customer, and the factory completes the processing and production as an agent.


3. Substituting processing technology for solid beverages: custom-made powders, granules or tea substitutes, the specific difficulty of the production process. If the process is simple, the processing cost is relatively low, while if the process is complex, the processing price is high.


4. The basic cost of OEM production: the cost of clearing the GMP workshop, the energy consumption of water and electricity necessary for the operation of the equipment, the labor cost of skilled workers, etc.

033007.webp

Advance payment for factory agency business: advanced payment for various testing items such as heavy metal detection of raw materials, pesticide residue detection, and product nutrition data detection, and logistics and transportation costs for raw materials, products, and other various production-related materials. This part of the cost will be reflected in the final payment after the end of the OEM OEM production of solid beverages.


After the specific content of the above factors is determined, the solid beverage OEM can make scientific and specific OEM quotations. On the one hand, the main way to determine is that the factory conducts product sampling experiments and trial assembly experiments to determine the specific production process and the usage of various consumables; on the other hand, it requires detailed consultation between the customer and the OEM manufacturer.


Simple processing cost of solid beverage OEM processing

Aluminum foil bagged products and teabags are about 0.15 yuan/bag;


The barreled product is about 1.5 yuan/barrel;


The price of traditional Chinese medicine water pills with the same medicine and food is about 60 yuan/kg.

011603.jpg

Solid beverage processing fee


1. After signing the OEM contract, the customer pays the corresponding proportion of fees agreed in the contract, so that the factory can start various matters related to the production project, including raw material procurement, label design, packaging material design and processing, and necessary audit work, etc.;


2. After the end of the solid beverage OEM cooperative production, the customer needs to complete the final payment, and the factory will deliver the goods. Most advance payment items will be calculated into the final payment.


3. The processing factory will charge for the subcontracting processing project twice, and issue corresponding invoices.